Restoring Industrial Shoreline and Sterling Shipyards Remediation

In 2025, KBL completed a complex remediation and water management project at the former Sterling Shipyards property within the Port of Vancouver on Burrard Inlet. The site, historically used as a shipyard and sawmill, contained extensive intertidal and subtidal contamination, including creosote timber, contaminated sediment, and historic debris. KBL was retained to remediate and upgrade […]
Beneficial Reuse of Stormwater Pond Sediment: Advancing Circular Economy Solutions in Calgary

KBL is proud to support innovative environmental solutions that advance sustainability, reduce waste, and promote circular economy practices across Western Canada. In collaboration with The City of Calgary and SYLVIS Environmental Services, KBL participated in a groundbreaking initiative focused on the beneficial reuse of stormwater pond sediment — transforming a historically landfilled waste stream into […]
NANAIMO LANDFILL NORTH SLOPE CLOSURE

CLIENT Regional District of Nanaimo (RDN) LOCATION Nanaimo, BC CONTRACT VALUE $1,900,000 SCHEDULE Start Date: August 2022End Date: August 2023 PROJECT PROFILE KBL (previously SECURE Energy) was awarded a contract of perform the installation of final cap materials over a portion of the North Slope at the Nanaimo Regional Landfill identified including anchor trench construction […]
Suncor Carbon Filtration Project

CLIENT Suncor Energy LOCATION Sherwood Park, AB CONTRACT VALUE $2,200,000 SCHEDULE Start Date: April 2023End Date: Present PROJECT PROFILE Suncor’s process and storm water ponds at the Edmonton Refinery exceed Alberta’s Tier I guideline in mercury contamination (0.005μg/L) for aquatic life discharge. The analytical data suggests the mercury contamination is approximately 2 – 5 times […]
LOMOND LANDFILL CAPPING

CLIENT Secure Energy LOCATION Lomond, Saskatchewan CONTRACT VALUE $1.6MM SCHEDULE Start Date: March 2024End Date: July 2024 PROJECT PROFILE The Client owns and operates the Industrial Landfill near Colgate SK. The project consisted of regrading the entire landfill footprint and constructing a permanent earth cover on three sides of the landfill. On the fourth side […]
ICIP Solid Waste Site Diversion Improvements

CLIENT Government of Northwest Territories, Department of Infrastructure LOCATION Various NWT, including Sachs Harbor, Paulatuk and Uluhuktok PROJECT RELEVANCE Remote camp locationsManaging hazardous and non-hazardous wasteIndigenous communitiesLabour Hours: 1200 SCHEDULE Start Date: June 2023 End Date: September 2025 PROJECT PROFILE KBL Environmental Ltd. (KBL) was retained by the Government of the Northwest Territories (GNWT) to act […]
IOL STRATHCONA REFINERY PSP CLEANING

CLIENT Imperial Oil Limited LOCATION Edmonton, AB CONTRACT VALUE Confidential SCHEDULE Start Date: September 2021End Date: On-going PROJECT PROFILE Imperial Oil Limited retained KBL for dredging and centrifuge dewatering of all the on-site ponds at the IOL Strathcona Refinery. The seven-year contract started in 2021 and scope execution happens annually. The number of ponds varies […]
METER STATION AND PIPELINE LATERAL DECOMMISSIONING AND ABANDONMENTS

CLIENT Confidential LOCATION Various Locations in Alberta CONTRACT VALUE >$20,000,000 SCHEDULE Start Date: August 2015End Date: Ongoing PROJECT PROFILE Since 2015, KBL Projects Ltd. has delivered large-scale Deactivation, Decommissioning, and Abandonment (DDA) program for a major North American energy transmission company as part of its ongoing pipeline infrastructure optimization and environmental liability reduction strategy. As […]
Hay River Landfill – Town of Hay River

CLIENT Town of Hay River LOCATION Hay River, NT SERVICES Site SupervisionSemi-Annual Groundwater SamplingOnsite Health and SafetyField ActivitiesAnnual ReportingCompliance MonitoringRegulator Correspondence SCHEDULE Start Date: June 2016End Date: Ongoing PROJECT PROFILE KBL Environmental Ltd. (KBL) was retained annually under contract with the Town of Hay River (TOHR) in 2016 through 2021 to provide groundwater sampling services […]
STEEL MILL SCRAP CLEANING

CLIENT Confidential LOCATION Selkirk, Manitoba VALUE Confidential SCHEDULE Start Date: November 2021End Date: Ongoing PROJECT PROFILE In 2018, KBL completed a trial study of the wood waste landfill located onsite. The purpose of the study was to determine the contents of the waste material within the landfill and to realize any potential recovery methods. A […]